
Concrete Foundations
Project Title: Seattle Customer
Summary: Sawcut, excavate, and install 3 deep foundations for infrastructure.
Summary: Sawcut, excavate, and install 3 deep foundations for infrastructure.
Concrete Trenches
Project Title: Multiple Utility Trenches
Summary: Sawcut, excavate, form, and pour machinery utility trench.
Summary: Sawcut, excavate, form, and pour machinery utility trench.
Copper Piping
Project Title: Compressed Air Piping
Summary: Installed various copper header and air drops.
Summary: Installed various copper header and air drops.
Cranes
Project Title: Multiple Crane Installations
Summary: Installed multiple crane systems on a limited schedule. Crane systems varied from new bridge, new jibs, relocated jibs, new Gorbel crane systems, and rail extensions. Project Title: Custom Fabricated Overhead Crane Relocation
Summary: Removal and reinstallation of 25 ton crane system, 300 of runway rail, 3 bridge cranes, and related utilities. Crane rails were 50 long and weighed 25,000LBS each. Project Title: Relocation, fabrication, and installation of multiple cranes.
Summary: Removal and relocation of (5) overhead bridge systems and connected to air/electric services. Installation of new jib cranes and anchors with air/electric service. Installation of new overhead workstation cranes. Demolition, relocation, and installation of existing overhead workstations.
Summary: Installed multiple crane systems on a limited schedule. Crane systems varied from new bridge, new jibs, relocated jibs, new Gorbel crane systems, and rail extensions. Project Title: Custom Fabricated Overhead Crane Relocation
Summary: Removal and reinstallation of 25 ton crane system, 300 of runway rail, 3 bridge cranes, and related utilities. Crane rails were 50 long and weighed 25,000LBS each. Project Title: Relocation, fabrication, and installation of multiple cranes.
Summary: Removal and relocation of (5) overhead bridge systems and connected to air/electric services. Installation of new jib cranes and anchors with air/electric service. Installation of new overhead workstation cranes. Demolition, relocation, and installation of existing overhead workstations.
Equipment Relocations
Project Title: Relocate paint and blast cleaning booths in Kent
Summary: Relocated miscellaneous paint and blast cleaning booths and installed utilities. Project Title: Fuel Fill Modification
Summary: Install 10 diameter main fuel line, including a 14 welded double containment pipe.
Summary: Relocated miscellaneous paint and blast cleaning booths and installed utilities. Project Title: Fuel Fill Modification
Summary: Install 10 diameter main fuel line, including a 14 welded double containment pipe.
Fabrication
Project Title: Maintenance stairway
Summary: Fabricated and installed maintenance stairway to roof.
Summary: Fabricated and installed maintenance stairway to roof.
Oven Installation
Project Title: Install provided oven.
Summary: Provided a turnkey installation for provided oven.
Summary: Provided a turnkey installation for provided oven.
Robotic Paint Systems
Project Title: Install two robotic paint systems
Summary: Install two robotic paint systems inside a production facility without interrupting production. Installation required innovative material handling.
Summary: Install two robotic paint systems inside a production facility without interrupting production. Installation required innovative material handling.
Paint Booths
Project Title: Install new paint/stain system.
Summary: Install 3/4 mile of overhead conveyor, 7 miles of SS fluid delivery piping, install 21 hydraulic pumps, install 7 paint booths, install 3 ovens, and related air piping.
Summary: Install 3/4 mile of overhead conveyor, 7 miles of SS fluid delivery piping, install 21 hydraulic pumps, install 7 paint booths, install 3 ovens, and related air piping.
Painting Systems
Project Title: Clear coat day room.
Summary: Installed back-up paint system and modified dayroom.
Summary: Installed back-up paint system and modified dayroom.
Plant Rearrangements
Project Title: Production Line Rearrangement
Summary: Relocated equipment, provided utilities, modified structure supports, installed racking, task from welding procedure through turnkey installation.
Summary: Relocated equipment, provided utilities, modified structure supports, installed racking, task from welding procedure through turnkey installation.
Pipe Welding
Project Title: High Pressure Fluid Service Pipe
Summary: Supplied and installed XX- strong piping for 10,000 PSI system. Performed tasks from welding procedure through turnkey installation.
Summary: Supplied and installed XX- strong piping for 10,000 PSI system. Performed tasks from welding procedure through turnkey installation.