Snap Shot of Past Projects

Skye Industrial - Commercial & Industrial Oven Installations

Concrete Foundations

Project Title: Seattle Customer
Summary: Sawcut, excavate, and install 3 deep foundations for infrastructure.

Concrete Trenches

Project Title: Multiple Utility Trenches
Summary: Sawcut, excavate, form, and pour machinery utility trench.

Copper Piping

Project Title: Compressed Air Piping
Summary: Installed various copper header and air drops.

Cranes

Project Title: Multiple Crane Installations
Summary: Installed multiple crane systems on a limited schedule. Crane systems varied from new bridge, new jibs, relocated jibs, new Gorbel crane systems, and rail extensions. Project Title: Custom Fabricated Overhead Crane Relocation
Summary: Removal and reinstallation of 25 ton crane system, 300 of runway rail, 3 bridge cranes, and related utilities. Crane rails were 50 long and weighed 25,000LBS each. Project Title: Relocation, fabrication, and installation of multiple cranes.
Summary: Removal and relocation of (5) overhead bridge systems and connected to air/electric services. Installation of new jib cranes and anchors with air/electric service. Installation of new overhead workstation cranes. Demolition, relocation, and installation of existing overhead workstations.

Equipment Relocations

Project Title: Relocate paint and blast cleaning booths in Kent
Summary: Relocated miscellaneous paint and blast cleaning booths and installed utilities. Project Title: Fuel Fill Modification
Summary: Install 10 diameter main fuel line, including a 14 welded double containment pipe.

Fabrication

Project Title: Maintenance stairway
Summary: Fabricated and installed maintenance stairway to roof.

Oven Installation

Project Title: Install provided oven.
Summary: Provided a turnkey installation for provided oven.

Robotic Paint Systems

Project Title: Install two robotic paint systems
Summary: Install two robotic paint systems inside a production facility without interrupting production. Installation required innovative material handling.

Paint Booths

Project Title: Install new paint/stain system.
Summary: Install 3/4 mile of overhead conveyor, 7 miles of SS fluid delivery piping, install 21 hydraulic pumps, install 7 paint booths, install 3 ovens, and related air piping.

Painting Systems

Project Title: Clear coat day room.
Summary: Installed back-up paint system and modified dayroom.

Plant Rearrangements

Project Title: Production Line Rearrangement
Summary: Relocated equipment, provided utilities, modified structure supports, installed racking, task from welding procedure through turnkey installation.

Pipe Welding

Project Title: High Pressure Fluid Service Pipe
Summary: Supplied and installed XX- strong piping for 10,000 PSI system. Performed tasks from welding procedure through turnkey installation.