Concrete FoundationsProject Title: Seattle Packaging Foundation Summary: Sawcut, excavate, and install 3 deep foundations for infrastructure. Concrete TrenchesProject Title: Multiple Utility Trenches Summary: Sawcut, excavate, form, and pour machinery utility trench. Copper PipingProject Title: Hexcell Compressed Air Piping Summary: Installed various copper header and air drops. CranesProject Title: Multiple crane installations Summary: Installed mulitiple craen systems on a limited schedule. Crane systems varied from new bridge, new jibs, relocated jibs, new Gorbel crane systems, and rail extensions. Project Title: Off-highway crane relocation. Summary: Removal and reinstallation of 25 ton crane system, 300 of runway rail, 3 bridge cranes, and related utilities. Crane rails were 50 long and weighed 25,000LBS each. Project Title: Relocation, fabrication, and installation of multiple cranes. Summary: Removal and relocation of (5) overhead bridge systems and connected to air/electric services. Installation of new jib cranes and anchors with air/electric service. Installation of new Zimmerman overhead workstation cranes. Demolition, relocation, and installation of existing overhead workstations. Equipment RelocationsProject Title: Relocate paint and blast cleaning booths at HEXCEL, Kent Summary: Relocated miscellaneous paint and blast cleaning booths and installed utilities. Project Title: Fuel Fill Modification Summary: Install 10 diameter main fuel line, including a 14 welded double containment pipe. | FabricationProject Title: Maintenance stairway Summary: Fabricated and installed maintenance stairway to roof. Oven InstallationProject Title: Install provided oven. Summary: Provided a turnkey installation for provided oven. Robotic Paint SystemsProject Title: Install two robotic paint systems Summary: Install two robotic paint systems inside a production facility without interrupting production. Installation required innovative material handling. Paint BoothsProject Title: Install new paint/stain system. Summary: Install 1/4 mile of overhead conveyor, 1/2 mile of SS fluid delivery piping, install 21 hydraulic pumps, install 7 paint booths, install 3 ovens, and related air piping. Painting SystemsProject Title: Clear coat day room. Summary: Installed back-up paint system and modified dayroom. Plant RearrangementsProject Title: Class 8 Truck and Peterbilt Rearrangement Summary: Relocated equipment, provided utilities, modified structure supports, installed racking, taske from weldingprocedure through turnkey installation. Pipe WeldingProject Title: High Pressure Fluid Service Pipe Summary: Supplied and installed XX- strong piping for 10,000 PSI system. Performed tasks from welding pocedure through turnkey installation. |